Important Announcement

Dear Customers , specifiers and suppliers, Allplastics Engineering is providing a range of custom made acrylic; polycarbonate and PETG screens and barriers for a diverse range of healthcare and business centres. Due to COVID restrictions announced by the New South Wales government on Saturday the 17th of July we request that all visitors to our showroom be restricted to manufacturing related enquiries and with appointments. All orders need to be picked by "call and collect without contact" from our warehouse only. All couriers to observe social distancing and QR code regulations. Together we will get through this.

  • Opening Hours: 8:30am - 5pm weekdays and 9am - 2pm Saturdays
  • Email Enquiry
  • Allplastics Sydney NSW
  • Allplastics on Instagram Allplastics on Facebook Allplastics on Twitter Allplastics on Linkdin Allplastics on Pinterest Allplastics on Google+

How to Utilise Your Swimming Pool in Winter Months

Innovative use of STAGE 40 panels

The Allplastics Architectural and Building division provided SAAJ Design in Melbourne for a creative application, where scratch resistant, anti-slip, translucent lightweight STAGE 40 Pep Core panels were supplied to the designer.
Considering the rising value of land, this project sought ways in which external spaces could have multiple functions. In Melbourne, the use of a pool is reduced to the warmer months of late spring to Autumn. What can be done with this space for the other six months of the year?

 
 
 

Our solution was to form the edge of this pool with a profile to accept aluminium, coloured joists which span full width. Stored in a pool equipment enclosure, 2.0m x 1.0m STAGE 40 panels from Allplastics (typically used for Rock stage platforms) span across the joists and ‘floor’ of the pool. Along with the perimeter terrace and via two ¼ of a tonne steel glass ‘gates,’ the pavilion connects to the pool creating an open floor plate some 14m long x 9.0m wide. Over the pool a trafficable platform is created having multiple possibilities during the non-swimming season (parties, mini tennis, mini basketball, junior bike riding, etc). Hence, the typical suburban ‘lawn’ has been recreated as a moveable platform over a pool.

The translucent flooring is available in standard panel sizes of 2m x 1m x 40mm thick, and can be easily lifted by one person. With LED lighting beneath, you can achieve amazing ambience. STAGE 40 panels will support 500 kg/m2.

Properties of STAGE Pep Core:

  • Anti slip surface (DIN rating)
  • Easy installation
  • Easy to handle
  • Excellent Light-Scattering properties
  • Excellent UV and weather resistance
  • Exceptional load capacity
  • Innovative translucent optic
  • Load capacity up to 500 kg/sqm
  • Meets AUST BCA fire tests
  • Outstanding scratch resistance
  • Superior Impact Resistance

PROJECTS & NEWS

About Us

ISO Certificate ISO 9001:2015 AU1506

Allplastics Engineering Pty Ltd is a privately owned Australian business specialising in the machining, fabrication and supply of polymer/ plastic materials for industrial, building and architectural applications
more about us >>

Our Memberships

asga20logo20small

asofia20logo20small

ccofcNSW Business Chambercovid-safe-badge


Contact us

  • Email Enquiry
  • Tel: (02) 8038 2000
  • Fax: (02) 9417 6169
  • Address:  Unit 20/ 380 Eastern Valley Way, Chatswood, NSW 2067.
  • Opening Hours:
    Weekdays: 8:30am - 5pm
    Saturdays: 9am - 2pm

Allplastics on Instagram Allplastics on Facebook Allplastics on Twitter Allplastics on Linkdin Allplastics on Pinterest Allplastics on Google+

review us on Google